Wall-Wetting Sprinkler and Drencher Systems

 
 
31 Wall-wetting sprinkler and drencher systems.jpg

Inspection, Test and Routine Servicing

The basis of inspection, test and routine servicing of Automatic Fire Sprinkler System is to make sure that all systems are operational and functioning correctly to the Standards.

The following systems are covered by this section of AS1851 -

(i) Wet pipe systems;

(ii) Dry pipe systems;

(iii) Deluge and water spray systems; and

(iv) Pre-action systems.

 
 

Where you can go to see what is fully required to comply?  

Maintenance Standard

  • AS1851-2012 Section 2 – Automatic Fire Sprinkler System

Minimum Standards of Performance

  • BCA 20__ E1.5 Sprinklers,

31 Wall-wetting sprinkler and drencher systems 1.jpg
 
 
31 Wall-wetting sprinkler and drencher systems 3.jpg

Inspection Intervals

All routine inspected and tested shall be in accordance with AS1851-2012.

NB: Special Hazards systems must also be maintained in accordance with the manufacturer’s specifications and guidelines.

Equipment Type Monthly 6 Monthly Yearly 5 Yearly 10 Yearly 25 Yearly 30 Yearly
Sprinkler Wet
Sprinkler Dry
Sprinkler Drencher
Sprinkler Per-Action
Sprinkler Water Spray
Fire Pumps Electric
Fire Pumps Diesel
Gas Suppression Systems
Tanks